Pipeline Content / Pipeline Content for ٺƵ en WATERWORKS: Pipeline Project, Waterway Drawdown /news/waterworks-pipeline-project-waterway-drawdown <p><strong>SURFACE WATER PIPELINE:</strong><strong> </strong>A contractor is <a href="/news/water-pipeline-will-soon-reach-campus/">building this line under Howard and Russell fields</a> to deliver a new water supply to the campus. The water will come from the Sacramento River by way of a new treatment plant that also serves Woodland and the city of Davis.&nbsp;</p> July 26, 2016 - 3:32pm Dave Jones /news/waterworks-pipeline-project-waterway-drawdown Water Pipeline Will Soon Reach Campus /news/water-pipeline-will-soon-reach-campus <p>A construction company estimates it will start work Sunday, July 10, at Russell Boulevard and A Street, trenching across Russell to lay the last section of pipe that will deliver a new supply of drinking water to the campus.</p> <section class="wysiwyg-feature-block "> <h3 class="wysiwyg-feature-block__title">Online Resources</h3> <div class="wysiwyg-feature-block__body"> <p><a href="/news/preparing-campuss-new-water-supply">“Preparing for the Campus’s New Water Supply,”</a> <em>Dateline ٺƵ</em><br> (June 7)</p></div></section> June 28, 2016 - 9:30am Dave Jones /news/water-pipeline-will-soon-reach-campus