California Hall Content / California Hall Content for ٺƵ en New Lecture Hall on the (California Ave.) Block /news/new-lecture-hall-block <p>ٺƵ has a new king of the lecture halls: California Hall, accommodating nearly 600 students, opened Monday morning (Jan. 7) with the start of the winter quarter.</p> <p>The hall (room number 1100) on California Avenue is surrounded by Hutchison, Asmundson, Kerr, Robbins and Haring halls in the campus core.</p> <p>The project that began with groundbreaking in June 2016 represents the campus’s first significant addition of classroom space in more than a decade.</p> January 08, 2019 - 2:25pm Dave Jones /news/new-lecture-hall-block Construction Projects Keep Crews Busy Over Summer /news/construction-projects-keeping-crews-busy-over-summer <p>The colors have been chosen for the squat racks, windows are going in and soon a crane will lower a large container into the courtyard — a container that will not only be used for storage of outdoor fitness equipment, but is itself a piece of fitness equipment.</p> July 24, 2018 - 9:00am Cody Kitaura /news/construction-projects-keeping-crews-busy-over-summer NEWS BRIEFS: ‘Large Lecture Hall’ Given ‘California’ Name /news/news-briefs-large-lecture-hall-given-california-name <p>The process of building ٺƵ’ new lecture hall has progressed like most other construction projects, but it will be unlike any other space on campus once it’s finished.</p> <p>California Hall, as it’s now called, <a href="/news/much-needed-lecture-hall-will-seat-600-2018">will include nearly 600 seats</a> and a bevy of new technology when it opens in winter quarter. The $22 million building between Hutchison Hall and California Avenue is ٺƵ’ first significant new classroom space in a decade, designed to help meet enrollment growth.</p> April 17, 2018 - 10:31am Dave Jones /news/news-briefs-large-lecture-hall-given-california-name Much-Needed Lecture Hall Will Seat 600 in 2018 /news/campus-breaks-ground-large-lecture-hall <p>Students are about to get a lot more space to learn.</p> <p>Campus officials broke ground June 3 on <a href="/node/45408">a 600-seat lecture hall to be situated between Hutchison Hall and California Avenue</a>. The $22 million building is scheduled for completion in January 2018.</p> <p>“A groundbreaking for a facility like this, which is so needed and is going to be so vibrantly used, is always an occasion for celebration,” Acting Chancellor Ralph J. Hexter said. “It will help us as we schedule large classes and ensure that there are no bottlenecks on the pathway to graduation.”</p> June 07, 2016 - 9:00am Cody Kitaura /news/campus-breaks-ground-large-lecture-hall ٺƵ to Break Ground for Large Lecture Hall /news/uc-davis-break-ground-large-lecture-hall <h2>What</h2> <figure role="group" class="caption caption-drupal-media align-right"> <div class="media media--type-sf-image-media-type media--view-mode-default"> <img loading="lazy" src="/sites/default/files/news/general-news/2016/may/lecturehallrendering.jpg" width="360" height="203" alt="A rendering of the exterior of a large building" typeof="Image"> </div> <figcaption>The large lecture hall will accommodate up to 600 students.</figcaption> </figure> <p>ٺƵ will celebrate the groundbreaking for a <a href="http://dcm.ucdavis.edu/projects/lecturehall/index.html"></a></p> June 02, 2016 - 4:00pm Julia Ann Easley /news/uc-davis-break-ground-large-lecture-hall